Monday, 21 March 2011

ccs 21/03/2011

Yesterday we were in class going over buit 4540, going through the seven stages of building a single level house.
Preliminary and general works, foundations, sub floor/flooring, wall framing, roof framing, envelopment-roof cladding and interiors-lining, going through our assignments and how to do it, going through the step of building a single level house. Then we moved on to the work shop and worked on our saw stool. Taking the saw stool legs we had cut out ealier and, looked for the bow and place that face down on the bench planer to removethe bow at the end, then we put it through the thicknesser to cut it down to size so it can fit into the four slots we had cut out.