04/05/2011 joist



 today we carried on with the same thing as yestrday. we laminated the last bearer using 100mm galvanised nails, we kept one side as the flush side then nailed it, we fixed it on to the jack stud then nailed it all in, then we used some timber which i think it ws 2x4's?? for the trusses which will help support the bearers which are on the jack studs from moving, we nailed one side onto the jack stud and nailed the other side on to the jack stud that was in the middle, we then marked out where each joist will go which will sit up on top of the bearers, we calculated how much timber that we were going to use for the joist and it was quite alot, we measured them and cut them down to size, we fixed them on the mark that they were suppose to be on, we nailed it on to the bearers, we did one side of joist first, nailed it to the bearers, we did it form one side of the bearers to where the middle bearer was, than did the same on the other side, when we fixed th joist on we stood it up on its side and nailed it on an angle. these pictures shows where the joist went, what tools we used to cut our timber etc..

Tuesday, 24 May 2011

02/05/2011 back to the site

we were in class for 2periods going over our first assignment which was buit 4540, telling us how we went, and how can we improve on it, i passed which was a good result, and then we went over buit 4542, what parts of the assignment we neede to work on which was calcs, after those two periods, we went down to the site, i worked with richards class, we were marking out where each joist will go, how far the spacing between each joist.

12/04/2011 work site

we carried on from yesterdayy, but this time we were marking out where the jack studs go, i measured the timber that was going to be used for the jack stud, cut them to the length of how high the string line was, which was our ffl, the spacing between each jack studs was 800mm, then nailed them in place, we then got two pieces of timber for the bearers, measure two of them of the same size then laminated them, nailing them on and angle so it wont go through the timber, the bearers will go on top of the jack studs which will determine the length of the FINISH FLOOR LEVEL

Sunday, 22 May 2011

11/4/2011 / work site/ profiling

today was the first day we went on site, checking out where we wer goin to work at, having a talk with th whole class on what was going to be done here every week, we started by clearing th site, taking all th scarp pieces of timber and throwing it away, taking out nails of timber, and disposing of the rubbish, cleaned up th site, we then grabbed the dumpy levels which is used for finding heights, and used it to mark the corners of the house, and where it ws goin to be, we then positioned the pegs to mark as the corner of our house, set up our batter boards and used the string line to position where the house was going to be and the shape of the house at its finish floor level height.  

Thursday, 7 April 2011

06/04/2011 profiling




today we were in class for one period  basically doing theory about nail guns, doing a test that we had to pass in order to get our gun licences, the test was based on when to use it, how to use it, how to use it safely etc. then after break we went into the work shop to talk about profilings, going over what we were going to do then got split into groups, we each got a dumpy level and camera, got a fair idea of how to set it up and use it, it took me a while from getting use to it but my team helped out, we headed back out side and set up our dumpy level, used it to find our finish floor level by using the datum point which will help us find the corner of the house by using the bearer lines. then at 1 o'clock, we headed off to the site to learn about the nail gun and then used it, i just found out that there are different types of nail guns but the one we used is the safest one.. i think thats what the man said, he showed us how to take it apart, how to clean it how to put it togehter , where to put in the nails, we basiclally learnt the ffeatures of the gun, later he let us fire some nails in to some timber which i enjoyed, it was a pretty cool lesson then we got marked of, later on we went back to the field to continue on with our profilings, we jus finished setting out our corners, using the string line to get a fair idea of what it wil look like which ws an rectaungular shape, then we measured it diagonally, two corners of our house was square except for the other two, we kept adjusting it till we got what we wanted and it ws sqaure thanks to marty lol, but yeah ive got a fair idea of how to use a dumpy level, how to find the datum and the finish floor level, overall it was a great excersie, havnt done it before so i leart alot today chuurr 

05/04/2011

umm today we were in class the whole day.. going over buit 4524 then went back to the work shop to finish of our saw stools havnt been marked of yet but hopefully i will pass

Monday, 4 April 2011

04/04/2011 buit 4542/ site safe

umm today we were in class the whole day.. going over buit 4542 which is based upon foundation.. what we are going to learn about and to get a better understanding to it.. we are still learning tho.. ummm?? then collin came in and we were going over site safe.. what it is etc.. going over what is a hazard how to eliminate, isolate, minimize an potential hazard.. he taught us what 5X5 is which is once you enter the site,, take 5min or less to see if it is a safe place to work at.. look for any potential hazards or threats that can happen to some one on the construction site.. how to inspect tool, leads, safety harness, etc.. and that you have a right to refuse to work if the place you are working at is unsafe.. thats all i can remeber haha churr :)