Tuesday, 7 June 2011

25/05/2011 making wall frames

 today we were in class fr about 2periods going over buit 4543, going over roofs, like webbing roofs and struts and ties, erection and fixing- gable roofs, hip or semi gable, line, etc... going over how to make a roof and what is needed and how to set it up and where to put ur studs, noggs, double top plate, ceiling battens, purlins etc.. after lunch break, we headed down to the site, having our little tool box talk .. richard and marty went over how to do the wall framing, how to do the bearers, where to put the noggs in, the studs, how far apart the studs and nogz wer,... we started of by measuring the 7 studs for our wall framing, 2420mm, two of the studs had packers between them , measured out the top and bottom plate placed both studs into place then nailed it to the studs, we then inserted our nogz in place, we had 2 rows of nogz between each stud and nailed them in, after that we had to laminate 2 timebers together for our lintel then put that at the top, then we inserted an metal brace going from one corner to the other, we used the skill saw to cut how deep the metal brace will go into the wall frames, then nailed it in.. we made 2 wall frames then stood them up and put them where they were suppose to go, it took us a while to fit it into place but at the end it looked good.








Wednesday, 25 May 2011

24/05/2011 wall framing




















today we had our usual tool box talk, richard went over the hazards etc, we all worked as one to help richards group finish of doing there floor, then me and a couple of the boys went to help marty measure out where the walls were going to go, used the sting line to help us find where exactly to put our wall frames, and used and straight edge and pencil to mark it out, all the wall frames were already made, pre nailed, after break, the boys grabbed our wall frames, each wall had a number so we know where to take it, we stood up one corner, nailed the bottom plate to the flooring using think it was 100mm flat heads galvanized nails, and the straight edge to make it straight, we grabbed another frame put it against the first frame then clamped them together so it wont move, then damian went and nailed  both top plate walls together so it wont move, then we nailed the whole wall together, we did that through out the whole day, putting up the walls, bracing them together clamping the nailing them, after that me and piula went to check all the corners of the house, seeing if they are all straight using the straight edge, had a quiet few bows in it but fixed most of them up, it started looking like a house which was good.. churr

23/05/2011 flooring





today we nearly finished of the flooring, we hammered and nailed in some parts of the flooringg, measuring and cutting the boards to size to fit into our left over gaps, while me and mike we cutting out pieces from the plywood to lay out than glue and nail it, we cut it using the skill saw, later on the day we finished doing the whole floor, putting on all the flooring including the ply, it looked good, had some gaps in between the boards but fixed it up using the glue :) , gave it a sweep and then marty marked out where the wall's were going to go,

17/05/2011 continue frm yestrdayy

we continued on from yestrdayy, still doing laying out the foil, cutting out gaps fr the glue and hammering down the particle boards, it will probably be the same thing this whole week?

16/05/2011 flooring



today we started on the flooring, finally we can walk on the house, we started out by nailing on the cleats from the joist to the bearers, so when the house gets picked up, the bearers will go with it, then we layed out the foil, with an 100mm sagg in the middle all the way, stapled it using the gun stapler, then cut in four rectangular shapes for the glue to go on, but first we marked out 100mm in the middle so we can put on the particle boards, buh i kinda effed it up by measuring it wrong, marty measured 100mm while i measured 105mm, we put the particle board on top of the foil glued it down using gorilla grip glue, than nailed it all down to the joist, both ends of the particle boards the spacing of each nail was meant to be 150mm, we nailed it down and in the middle was 200mm. but back to the 105mm that was wrong, it ended up going out 150mm off,, which was a huge eff up. we managed to put on some of the particle boards, kept on running the foil through and putting on glue, we used the plywood for where the showers will go and the toilets. pictures of us laying down the foil, hammering on the particle board on to the joist, glueing etc..

10/05/2011 carried on with nogging


today was a whole day of practical.. better, dont like theory, team marty was carring on with nogging, and half of th boiz wnt on to do the nail plates, there were two plates used, one of them was nailed into the bearers, which will overlap a or a joint where it is laminated, and the other one was nailed onto the joist which was nailed on to the middle bearer.

09/05/2011 nogging

today at the site, we split into the usual groups, team marty's nd team richard's, i was with richard's group again putting on the last of the floor joist, putting them in thea place and nailing them in, after that they measured out pieces of timber for nogging, while i went with marty and grabed the dumpy level, set it up then used a piece of timber at the staff, we went and checked every height of the house, some parts of the house was lower than the other, so we removed the jack stud that was wrong and put up a new one which adjusted the height of the house abit, we went around checking it all, and found that some heights in the corner and the middle of the house was of so we removed some jack studs and out new jack studs to adjust the height, we did it till our floor was all at the right height and it was..