Thursday, 7 April 2011
06/04/2011 profiling
today we were in class for one period basically doing theory about nail guns, doing a test that we had to pass in order to get our gun licences, the test was based on when to use it, how to use it, how to use it safely etc. then after break we went into the work shop to talk about profilings, going over what we were going to do then got split into groups, we each got a dumpy level and camera, got a fair idea of how to set it up and use it, it took me a while from getting use to it but my team helped out, we headed back out side and set up our dumpy level, used it to find our finish floor level by using the datum point which will help us find the corner of the house by using the bearer lines. then at 1 o'clock, we headed off to the site to learn about the nail gun and then used it, i just found out that there are different types of nail guns but the one we used is the safest one.. i think thats what the man said, he showed us how to take it apart, how to clean it how to put it togehter , where to put in the nails, we basiclally learnt the ffeatures of the gun, later he let us fire some nails in to some timber which i enjoyed, it was a pretty cool lesson then we got marked of, later on we went back to the field to continue on with our profilings, we jus finished setting out our corners, using the string line to get a fair idea of what it wil look like which ws an rectaungular shape, then we measured it diagonally, two corners of our house was square except for the other two, we kept adjusting it till we got what we wanted and it ws sqaure thanks to marty lol, but yeah ive got a fair idea of how to use a dumpy level, how to find the datum and the finish floor level, overall it was a great excersie, havnt done it before so i leart alot today chuurr
05/04/2011
umm today we were in class the whole day.. going over buit 4524 then went back to the work shop to finish of our saw stools havnt been marked of yet but hopefully i will pass
Monday, 4 April 2011
04/04/2011 buit 4542/ site safe
umm today we were in class the whole day.. going over buit 4542 which is based upon foundation.. what we are going to learn about and to get a better understanding to it.. we are still learning tho.. ummm?? then collin came in and we were going over site safe.. what it is etc.. going over what is a hazard how to eliminate, isolate, minimize an potential hazard.. he taught us what 5X5 is which is once you enter the site,, take 5min or less to see if it is a safe place to work at.. look for any potential hazards or threats that can happen to some one on the construction site.. how to inspect tool, leads, safety harness, etc.. and that you have a right to refuse to work if the place you are working at is unsafe.. thats all i can remeber haha churr :)
Wednesday, 23 March 2011
ccs tec drawings 23/03/2011
today we were in class for 2 periods with Louise, shes was going through all the stuff we need to know like how to read a plan, which way the door opens and shut, and the windows etc, talking about sub floor and the roof, the area/foundation, then we started our first drawing assessment which was to draw a brick?? like WTF?? lol jx learnt how to draw it, how to read it and to divide exp390mm by four if the scale is 1:4, haven't quiet finished it drawing yet, later that day we went back into the work shop to finish off our saw stools, finished putting on my fours legs, learnt that the bevel can be useful, adjusting it to 1:3 to mark out the angle for the saw stool legs and fitting it onto the four slots we cut out last week, hammered it and nailed it all in and now it is squared :) churr
Monday, 21 March 2011
ccs 21/03/2011
Yesterday we were in class going over buit 4540, going through the seven stages of building a single level house.
Preliminary and general works, foundations, sub floor/flooring, wall framing, roof framing, envelopment-roof cladding and interiors-lining, going through our assignments and how to do it, going through the step of building a single level house. Then we moved on to the work shop and worked on our saw stool. Taking the saw stool legs we had cut out ealier and, looked for the bow and place that face down on the bench planer to removethe bow at the end, then we put it through the thicknesser to cut it down to size so it can fit into the four slots we had cut out.
Preliminary and general works, foundations, sub floor/flooring, wall framing, roof framing, envelopment-roof cladding and interiors-lining, going through our assignments and how to do it, going through the step of building a single level house. Then we moved on to the work shop and worked on our saw stool. Taking the saw stool legs we had cut out ealier and, looked for the bow and place that face down on the bench planer to removethe bow at the end, then we put it through the thicknesser to cut it down to size so it can fit into the four slots we had cut out.
Sunday, 13 March 2011
carpentry ccs 2011
monday 14th march
today we are making gmail accounts and blogger to help us with our study in unitec.
today we are making gmail accounts and blogger to help us with our study in unitec.
Subscribe to:
Posts (Atom)




